Instrumentation and monitoring
Monitoring of settlement, ground movement and groundwater conditions. Select the instruments and reading schedule for the investigation or construction works.
Define the monitoring plan
Agree instrument locations, baseline readings, monitoring intervals and reporting responsibilities. Monitoring records conditions; it does not prevent movement or replace engineering assessment.
Tests in this family
-
Inclinometer Monitoring
Inclinometer monitoring records changes in inclination to assess lateral movement with depth. Results support ground and retaining-structure monitoring.
-
Piezometer Monitoring
Piezometer monitoring measures groundwater level or pore-water pressure, depending on the instrument. The type and reading schedule are selected for the monitoring plan.


